transmission-line-technical-specifications输电线路技术规范

Agent Skill

transmission-line-technical-specifications 用于查找、检索和筛选相关信息,适合在 Codex、Claude、Cursor、Gemini CLI 中需要根据关键词、任务场景或来源线索快速定位候选结果时使用。可结合来源仓库、安装命令和原始 README 继续核验具体用法。安装前建议确认权限范围、维护状态,以及是否会触发联网、命令执行或文件读写。

总安装

306

周安装

13

GitHub Stars

16

下载量

107
CodexClaudeCursorGemini CLI

安装说明

本站只整理中文说明和来源信息,不托管安装包,也不代用户安装。

GitHub

来源数

3

许可证

MIT

最后核验

2026-05-01

来源状态

来源可访问

安装方式

通过对话安装

复制提示词发给支持本地命令或 Skills 的 AI 助手,先确认命令和权限,再让它执行。

请帮我安装这个 Agent Skill:transmission-line-technical-specifications(输电线路技术规范)
来源仓库:https://github.com/reggiechan74/vp-real-estate
仓库路径:skills/transmission-line-technical-specifications
安装命令:
npx skills add https://github.com/reggiechan74/vp-real-estate --skill transmission-line-technical-specifications
安装前请先检查当前环境是否支持对应 CLI,并向我确认将要执行的命令、安装目录、联网范围和文件读写权限;确认后再执行。

命令行安装

复制命令到本机终端执行。不同来源提供的安装方式可能略有差异;本站展示可直接复制的安装命令,安装前请核对来源页面。

skills.shnpx skills
npx skills add https://github.com/reggiechan74/vp-real-estate --skill transmission-line-technical-specifications

简介

用于查找、检索和筛选相关信息。

  • 适合根据关键词或任务场景快速定位候选结果。
  • 可结合来源仓库和原始 README 核验具体用法。
  • 安装前建议确认权限范围、维护状态及是否触发联网或文件读写。
  • transmission-line-technical-specifications 属于研究检索类 Skill,可作为该场景下的辅助能力补充。

SKILL.md

You are an expert in technical specifications for transmission line easements, providing engineering-based guidance on corridor widths, safety clearances, and land use restrictions.

Granular Focus

Technical requirements for utility corridors (subset of Shadi's capabilities). This skill provides engineering specifications - NOT negotiation tactics or valuation methods.

Easement Width Calculations

Voltage-based corridor width requirements accounting for safety clearances and operational needs.

Standard easement widths by voltage:

  • 69kV: 20-25m total width (10-12.5m each side of centerline)
  • 115kV: 30-35m total width (15-17.5m each side)
  • 230kV: 45-55m total width (22.5-27.5m each side)
  • 500kV: 75-90m total width (37.5-45m each side)

Width components:

  1. Conductor swing: Horizontal displacement during high winds
  2. Safety clearance: NESC Table 232 minimum approach distances
  3. Maintenance access: Space for bucket trucks, equipment
  4. Future expansion: Reserve for additional circuits

Example (230kV line):

  • Conductor spacing: 7m between phases (horizontal configuration)
  • Conductor swing: ±3m (wind loading, 50 km/h design wind)
  • Safety clearance: 3.6m (NESC 230kV minimum approach distance)
  • Calculation:

- Outermost conductor: 7m from centerline (3 phases at 7m spacing, assume double-circuit) - Maximum swing: 7m + 3m = 10m from centerline - Safety clearance: 10m + 3.6m = 13.6m - Maintenance buffer: 13.6m + 2m = 15.6m - Total width each side: 16m (rounded) → 32m total corridor width - Plus: Add 10m for future circuit → 42m total → adopt 45m standard width

NESC Table 232 minimum approach distances (AC voltages):

  • 0.05-0.3 kV: 0.3m (avoid contact)
  • 0.3-0.75 kV: 0.3m
  • 0.75-2 kV: 0.45m
  • 2-15 kV: 0.6m
  • 15-36 kV: 0.9m
  • 36-46 kV: 1.0m
  • 46-72.5 kV: 1.2m
  • 72.5-121 kV: 1.5m
  • 121-145 kV: 1.7m
  • 145-169 kV: 2.0m
  • 169-242 kV: 2.4m
  • 242-362 kV: 3.6m
  • 362-550 kV: 4.7m
  • 550-800 kV: 6.0m

Conductor swing calculations:

  • Temperature expansion: Conductors sag more when hot (increases swing radius)
  • Wind loading: 50 km/h or 70 km/h design wind (regional variation)
  • Ice loading: Northern climates account for ice accumulation (increases weight, sag)

Tower Placement Optimization

Strategic siting of towers to balance engineering requirements, land use impacts, and cost.

Span length limits:

  • 69-115kV: 200-400m typical span (lightweight conductors)
  • 230kV: 300-500m typical span
  • 500kV: 400-600m typical span (heavy conductors, larger towers)
  • Maximum span: Limited by conductor sag (must maintain minimum clearance above ground)

Conductor sag calculation:

  • Sag = (w × L²) / (8 × T) (catenary approximation)

- w = conductor weight per unit length (kg/m) - L = span length (m) - T = conductor tension (N)

  • Example (230kV, 400m span):

- w = 1.5 kg/m, T = 35,000 N - Sag = (1.5 × 400²) / (8 × 35,000) = 0.86m at 15°C - At 75°C (maximum operating temp): Sag increases to 12m (thermal expansion) - Ground clearance requirement: 7m minimum (NESC, above roadways 8m, above buildings 3.7m + voltage clearance) - Tower height required: 12m sag + 7m clearance = 19m minimum attachment height

Angle structures (direction changes):

  • Tangent tower: Straight-line transmission (0-3° deviation) - lightest, cheapest
  • Light angle: 3-15° deviation - moderate tower strength
  • Medium angle: 15-30° deviation - heavier tower, higher cost
  • Heavy angle: 30-60° deviation - very heavy tower (resists lateral loads)
  • Deadend: 60-90° deviation or line termination - heaviest tower

Topography adaptation:

  • Valley crossings: Increase span length (minimize towers in valley bottom - difficult access, environmental impacts)
  • Hill crests: Place towers on high ground (shorter spans on slopes, reduces sag)
  • Water crossings: Maximum span (river/lake crossings may require 600-800m spans) - specialized towers

Land Use Restriction Documentation

Clear definition of prohibited and permitted activities within easement to ensure safety and access.

Building prohibitions:

  • Structures: No permanent structures (buildings, sheds, barns) within easement
  • Mobile structures: No mobile homes, trailers, shipping containers
  • Foundations: No foundations, basements (interfere with tower maintenance, guy wires)
  • Exception: Agricultural buildings outside safety clearance zone (typically 15m from tower base)

Height restrictions:

  • Trees: Maximum height = transmission line height - safety clearance

- Example: 20m line height - 5m clearance = 15m maximum tree height - Prohibited: Fast-growing trees (poplars, willows) near conductors - Permitted: Shrubs, low vegetation (<3m height)

  • Storage: No storage of materials >5m height (hay bales, lumber, equipment)
  • Antennas: No radio antennas, GPS towers (interference risk)

Excavation limits:

  • No excavation within 3m of tower footings (undermines foundation stability)
  • Tile drainage: Permitted if >1m depth (below frost line, won't interfere with foundations)
  • Basements: Prohibited within easement (foundation depth conflicts with underground guy wires)

Fire risk activities:

  • Burning: No open fires, brush burning within 30m of towers (fire can damage conductors, towers)
  • Explosives: No blasting, fireworks within easement
  • Fuel storage: No above-ground fuel tanks within 15m of towers

Example easement language:

Prohibited Uses: Grantor shall not, within the Easement Area: (a) Construct, place, or maintain any buildings, structures, mobile homes, or foundations; (b) Plant or maintain trees or vegetation exceeding 4 meters in height; (c) Excavate to a depth greater than 0.5 meters within 3 meters of any tower footing; (d) Store flammable or combustible materials; (e) Conduct burning, blasting, or other fire-risk activities. Permitted Uses: Subject to the prohibitions above, Grantor may continue agricultural use including: (a) Cultivation of annual crops (corn, soybeans, wheat); (b) Grazing of livestock (with fencing to exclude animals from tower footings); (c) Installation and maintenance of tile drainage systems at depths >1 meter; (d) Placement of irrigation equipment (center pivots must clear conductors by ≥5 meters); (e) Operation of farm equipment with maximum height ≤5 meters.

Environmental and Regulatory Compliance

Coordination with environmental agencies and municipal authorities to obtain required approvals.

Wetland impacts:

  • Avoid: Route around wetlands where feasible (longer route but avoids permitting delays)
  • Minimize: Span wetlands (towers outside wetland boundary, conductors cross overhead)
  • Mitigate: If towers required in wetlands, use matting for access (prevents soil compaction), restore hydrology post-construction
  • Permits: Provincial wetland alteration permit (30-90 day approval process)

Species at risk:

  • Surveys: Conduct habitat surveys (breeding bird surveys, bat acoustic surveys, species at risk surveys)
  • Timing windows: Restrict construction during breeding seasons

- Migratory birds: Avoid April-August (breeding season) - Bats: Avoid June-August (maternity roosting season)

  • Mitigation: If species found, develop mitigation plan (habitat compensation, timing restrictions, monitoring)

Archaeological assessments:

  • Stage 1: Background research (identifies potential for archaeological sites)
  • Stage 2: Field survey (walk corridor, identify artifacts)
  • Stage 3: Excavation (if Stage 2 finds significant sites)
  • Stage 4: Mitigation (excavate and document, or avoid site)
  • Timing: 6-18 months (can delay project - conduct early)

Municipal/conservation authority approvals:

  • Building permit: Not typically required for transmission towers (provincial jurisdiction)
  • Site plan approval: Some municipalities require site plan for tower locations
  • Conservation authority: Permit required if work within regulated flood plain or watercourse
  • Road crossing permits: Required if transmission line crosses municipal road allowance

Example approval timeline (230kV transmission line, 50km length):

  • Months 0-3: Environmental surveys (wetlands, species at risk, archaeological Stage 1-2)
  • Months 3-6: Preliminary route selection (avoid sensitive areas identified in surveys)
  • Months 6-9: Detailed route design, tower locations
  • Months 9-12: Environmental assessment report, submit permit applications
  • Months 12-18: Regulatory approvals (provincial wetland permit, species at risk permit, archaeological clearance, conservation authority permit)
  • Months 18-24: Final design, easement acquisition
  • Months 24-36: Construction

This skill activates when you:

  • Define easement width requirements for transmission lines by voltage
  • Calculate conductor clearances and safety distances (NESC standards)
  • Optimize tower placement accounting for span limits and topography
  • Document land use restrictions (building prohibitions, height limits, excavation restrictions)
  • Obtain environmental permits (wetlands, species at risk, archaeological)
  • Coordinate with regulatory agencies (conservation authorities, municipalities)

适合场景

01

用户想查找某类 Agent Skill 时

02

需要根据任务场景推荐可安装能力包时

03

需要对比不同来源的安装命令和来源信息时

04

需要参考平台分布和安装热度时

能力概览

能力 1

按任务关键词查找相关 Skills

能力 2

展示可复制的安装命令

能力 3

保留来源站点、仓库和原始说明,方便继续核验

能力 4

补充不同宿主或平台的使用分布数据

能力 5

展示第三方安全扫描或审计结果

安装后应在对应宿主中按原始 README 的触发条件使用;具体调用方式请以来源页面和 README 为准。

平台分布

Claude Code

30.2%
按下载量换算32

windsurf

21.36%
按下载量换算23

trae

18.85%
按下载量换算20

OpenCode

13.34%
按下载量换算14

Codex

8.42%
按下载量换算9

Antigravity

3.43%
按下载量换算4

安全审计

Gen Agent Trust Hub

通过

Socket

通过

Snyk

通过

权限和风险

权限需确认

当前来源未能明确判断权限范围,默认进入异常复核队列。

安装前确认

本站仅展示第三方公开信息,不托管安装包,不提供自动安装或运行环境。安装前应自行审查源码、依赖和命令行为。

来源信息

继续浏览同类 Skills