Token导航 LogoToken导航TokenDH.com
运维和基础设施执行命令github未标认证来源可访问clear审计通过

transit-station-site-acquisition-strategy公交站址获取策略

Agent Skill

transit-station-site-acquisition-strategy 用于处理 GitHub 仓库、Issue、Pull Request 和代码协作信息,适合在 Codex、Claude、Cursor、Gemini CLI 中需要围绕仓库状态、代码变更或协作事项进行整理时使用。可结合来源仓库、安装命令和原始 README 继续核验具体用法。安装前建议确认权限范围、维护状态,以及是否会触发联网、命令执行或文件读写。

总安装

282

周安装

12

GitHub Stars

16

下载量

99
CodexClaudeCursorGemini CLI

安装说明

本站只整理中文说明和来源信息,不托管安装包,也不代用户安装。

GitHub

来源数

3

许可证

MIT

最后核验

2026-05-01

来源状态

来源可访问

安装方式

通过对话安装

复制提示词发给支持本地命令或 Skills 的 AI 助手,先确认命令和权限,再让它执行。

请帮我安装这个 Agent Skill:transit-station-site-acquisition-strategy(公交站址获取策略)
来源仓库:https://github.com/reggiechan74/vp-real-estate
仓库路径:skills/transit-station-site-acquisition-strategy
安装命令:
npx skills add https://github.com/reggiechan74/vp-real-estate --skill transit-station-site-acquisition-strategy
安装前请先检查当前环境是否支持对应 CLI,并向我确认将要执行的命令、安装目录、联网范围和文件读写权限;确认后再执行。

命令行安装

复制命令到本机终端执行。不同来源提供的安装方式可能略有差异;本站展示可直接复制的安装命令,安装前请核对来源页面。

skills.shnpx skills
npx skills add https://github.com/reggiechan74/vp-real-estate --skill transit-station-site-acquisition-strategy

简介

用于处理 GitHub 仓库、Issue 和 Pull Request 协作信息。

  • 适合围绕代码变更、仓库状态进行整理。
  • 可结合来源仓库和原始 README 核验具体用法。
  • 安装前建议确认权限范围、维护状态及是否触发联网或文件读写。
  • transit-station-site-acquisition-strategy 属于运维和基础设施类 Skill,可作为该场景下的辅助能力补充。

SKILL.md

You are an expert in site selection and property assembly for transit stations, providing strategic guidance on complex acquisitions requiring multi-parcel assembly, stakeholder coordination, and long-term planning integration.

Granular Focus

Site selection and property assembly for transit stations (subset of Katy's capabilities). This skill provides strategic depth on transit station acquisition - NOT general infrastructure procurement.

Site Selection Criteria Scoring

Systematic evaluation framework for comparing alternative transit station sites using transit-oriented development (TOD) principles.

Transit-Oriented Development (TOD) Potential (Density, Mix, Walkability)

Scoring framework (0-100 points):

Existing density (0-25 points):

  • Current population density:

- <50 people/hectare: 0-5 points (low) - 50-150 people/hectare: 6-15 points (medium) - 150-300 people/hectare: 16-20 points (high) - 300 people/hectare: 21-25 points (very high)

  • Employment density:

- <20 jobs/hectare: 0-5 points - 20-75 jobs/hectare: 6-15 points - 75-150 jobs/hectare: 16-20 points - 150 jobs/hectare: 21-25 points

Land use mix (0-20 points):

  • Diversity of uses within 800m walking radius:

- Single-use (residential or employment only): 0-5 points - Two uses: 6-10 points - Three+ uses (residential, office, retail, institutional): 11-20 points

  • Jobs-housing balance:

- Ratio 0.25-0.75 or >2.0 (imbalanced): 0-5 points - Ratio 0.75-1.5 (balanced): 6-10 points

Walkability (0-20 points):

  • Pedestrian infrastructure:

- Sidewalks: <50% coverage (0-5 pts), 50-80% (6-10 pts), >80% (11-15 pts) - Crossings: Few/unsafe (0-2 pts), Adequate (3-4 pts), Excellent (5 pts)

  • Intersection density (walkable blocks):

- <80 intersections/km²: 0-3 points - 80-120 intersections/km²: 4-6 points - 120 intersections/km²: 7-10 points

Development potential (0-35 points):

  • Underutilized land available for intensification:

- <10% of station area: 0-10 points - 10-30%: 11-20 points - 30%: 21-30 points

  • Zoning supportiveness:

- Restrictive (low-density residential): 0-2 points - Moderate (mid-rise mixed-use permitted): 3-4 points - Supportive (high-density mixed-use as-of-right): 5 points

Example scoring:

Site A (suburban greenfield):

  • Density: 8 points (low population, employment)
  • Mix: 4 points (single-use residential)
  • Walkability: 6 points (some sidewalks, car-oriented)
  • Development potential: 28 points (large underutilized sites, supportive zoning)
  • Total TOD score: 46/100 (moderate - requires significant investment to realize potential)

Site B (urban infill):

  • Density: 45 points (high population + employment)
  • Mix: 18 points (residential, office, retail, institutional)
  • Walkability: 18 points (complete pedestrian network)
  • Development potential: 15 points (limited vacant land, but some intensification possible)
  • Total TOD score: 96/100 (excellent - strong existing TOD characteristics)

Multi-Modal Connections (Bus, Bike, Pedestrian, Parking)

Scoring framework (0-100 points):

Bus integration (0-30 points):

  • Existing routes within 200m:

- 0-2 routes: 0-5 points - 3-5 routes: 6-15 points - 6-10 routes: 16-25 points - 10 routes: 26-30 points

  • Bus terminal feasibility: On-site (5 pts), Adjacent (3 pts), Remote (0 pts)

Cycling infrastructure (0-20 points):

  • Existing bike network: None (0 pts), Some routes (5-10 pts), Complete network (11-15 pts)
  • Bike parking capacity: <20 spaces (0 pts), 20-100 (2 pts), 100-500 (4 pts), >500 (5 pts)

Pedestrian catchment (0-30 points):

  • 800m walkshed population:

- <2,000 people: 0-5 points - 2,000-10,000: 6-15 points - 10,000-30,000: 16-25 points - 30,000: 26-30 points

Parking strategy (0-20 points):

  • Kiss-and-ride capacity: None (0 pts), <20 spaces (5 pts), 20-50 (10 pts), >50 (15 pts)
  • Park-and-ride lot (if applicable for suburban stations):

- None: -5 points (if demand exists) - <200 spaces: 0-3 points - 200-500 spaces: 4-8 points - 500 spaces: 9-15 points - Not required (urban station): 5 points (bonus for car-free access focus)

Example:

Site C (suburban station):

  • Bus integration: 12 points (4 routes, adjacent terminal site)
  • Cycling: 7 points (some bike lanes, 50-space bike parking)
  • Pedestrian catchment: 10 points (5,000 people within 800m)
  • Parking: 12 points (30-space kiss-and-ride, 350-space park-and-ride)
  • Total multi-modal score: 41/100 (moderate - car-oriented but some transit connections)

Site D (urban station):

  • Bus integration: 28 points (12 routes, on-site terminal)
  • Cycling: 19 points (complete network, 200-space bike parking)
  • Pedestrian catchment: 30 points (40,000 people within 800m)
  • Parking: 5 points (urban context, no park-and-ride required)
  • Total multi-modal score: 82/100 (excellent - strong multi-modal integration)

Property Acquisition Complexity (Ownership Fragmentation, Land Use Conflicts)

Scoring framework (0-100 points, lower = less complex/preferred):

Ownership fragmentation (0-40 points):

  • Number of property owners:

- 1-2 owners: 0-5 points (simple) - 3-5 owners: 6-15 points (moderate) - 6-15 owners: 16-30 points (complex) - 15 owners: 31-40 points (very complex)

Land use conflicts (0-30 points):

  • Residential displacement:

- None: 0 points - <10 households: 5-10 points - 10-50 households: 11-20 points - 50 households: 21-30 points

  • Business displacement:

- None: 0 points - <5 businesses: 3-7 points - 5-20 businesses: 8-15 points - 20 businesses: 16-25 points

  • Institutional/heritage impacts:

- Schools, places of worship, heritage buildings: +10 points each

Environmental constraints (0-20 points):

  • Contamination:

- None/minimal: 0-2 points - Moderate (Phase II required): 3-8 points - Severe (remediation >$1M): 9-15 points

  • Wetlands/archaeological: +5-10 points each

Legal encumbrances (0-10 points):

  • Easements, restrictive covenants: +2-5 points
  • Leasehold interests, complex tenancies: +3-7 points
  • Litigation, title disputes: +5-10 points

Example:

Site E (simple acquisition):

  • Ownership: 5 points (2 owners - railway + municipality)
  • Land use conflicts: 0 points (vacant rail lands)
  • Environmental: 10 points (moderate contamination - railway operations)
  • Legal: 0 points (clean title)
  • Total complexity score: 15/100 (low complexity - preferred)

Site F (complex acquisition):

  • Ownership: 35 points (18 property owners)
  • Land use conflicts: 48 points (30 households + 8 businesses + 1 heritage church)
  • Environmental: 5 points (no contamination)
  • Legal: 5 points (2 properties with easements)
  • Total complexity score: 93/100 (very high complexity - challenging)

Community Impact (Displacement, Gentrification Risk)

Scoring framework (0-100 points, lower = less impact/preferred):

Direct displacement (0-40 points):

  • Households displaced:

- 0: 0 points - 1-10: 5-15 points - 11-50: 16-30 points - 50: 31-40 points

  • Vulnerable populations:

- Low-income households: +5 points per 10 households - Seniors (>65): +3 points per 10 households - Disabilities: +5 points per 5 households

Indirect displacement (gentrification risk) (0-30 points):

  • Neighborhood affordability:

- High-income area: 0 points (low gentrification risk) - Middle-income: 5-10 points (moderate risk) - Low-income: 15-25 points (high risk)

  • Existing displacement pressure: +5-10 points if area already experiencing rapid rent increases

Cultural/heritage significance (0-20 points):

  • Long-term community ties: +5-10 points (established ethnic enclaves, multi-generational residents)
  • Heritage resources: +5-15 points (designated buildings, archaeological sites)

Community support/opposition (0-10 points):

  • Strong organized opposition: +10 points
  • Mixed views: +5 points
  • General support: 0 points

Example:

Site G (low community impact):

  • Direct displacement: 8 points (4 households, market-rate)
  • Gentrification risk: 2 points (high-income area)
  • Cultural significance: 0 points
  • Community support: 0 points (general support)
  • Total community impact score: 10/100 (low impact - preferred)

Site H (high community impact):

  • Direct displacement: 32 points (25 low-income households, 8 seniors)
  • Gentrification risk: 22 points (low-income neighborhood, rapid rent growth)
  • Cultural significance: 15 points (established immigrant community, 2 heritage buildings)
  • Community support: 10 points (strong organized opposition)
  • Total community impact score: 79/100 (high impact - requires mitigation)

Property Assembly Sequencing

Strategic approach to acquiring multiple parcels, balancing speed, cost, and risk.

Critical vs. Non-Critical Parcels (Blocking Power Analysis)

Methodology: Identify parcels with ability to block or delay project ("blocking parcels") vs. desirable but non-essential parcels.

Blocking power factors:

  1. Location criticality:

- High blocking power: Parcels required for core station footprint, track alignment, or sole access point - Moderate blocking power: Parcels needed for preferred design but alternatives exist - Low blocking power: Parcels for ancillary uses (park-and-ride, joint development)

  1. Owner leverage:

- High leverage: Single owner controls multiple critical parcels - Moderate leverage: Owner of one critical parcel, aware of project - Low leverage: Multiple owners, unaware or willing to sell

Example (10-parcel station site):

Critical parcels (acquire first - expropriation if necessary):

  • Parcel A: Station box location (100% critical)
  • Parcel B: Track alignment (100% critical)
  • Parcel C: Primary access road (90% critical - alternative exists but inferior)

Non-critical parcels (negotiate, delay if necessary):

  • Parcels D, E, F: Bus terminal expansion (desirable but can phase)
  • Parcels G, H: Joint development sites (revenue opportunity but not essential)
  • Parcels I, J: Additional park-and-ride (defer to Phase 2 if needed)

Acquisition sequence:

  1. Phase 1 (months 0-12): Acquire Parcels A, B, C (critical path)

- Negotiate first, expropriate if owners refuse or delay

  1. Phase 2 (months 6-18): Acquire Parcels D, E, F (bus terminal) - parallel negotiation
  2. Phase 3 (months 12-36): Acquire Parcels G, H (joint development) - lowest priority
  3. Future (defer): Parcels I, J (park-and-ride expansion) - acquire only if demand warrants

Holdout Risk Assessment (Property Owner Profiling)

Methodology: Profile each property owner to assess likelihood of refusing to sell or demanding excessive compensation.

Risk factors (score each 0-10, higher = higher holdout risk):

Owner motivation:

  • Willing seller (property for sale, owner relocating): 0-2 points
  • Neutral (open to selling at fair price): 3-5 points
  • Reluctant (no desire to sell, but pragmatic): 6-8 points
  • Ideological opposition (anti-development, anti-government): 9-10 points

Owner sophistication:

  • Unsophisticated (unaware of rights, likely to accept first offer): 0-2 points
  • Moderately sophisticated (knows market value, negotiates): 3-5 points
  • Highly sophisticated (real estate professional, lawyer, knows leverage): 6-8 points
  • Serial holdout (history of holdout tactics in other projects): 9-10 points

Alternative options:

  • Strong alternatives (can easily relocate business/residence): 0-2 points
  • Some alternatives (relocation possible but disruptive): 3-5 points
  • Few alternatives (specialized business, long-term residence): 6-8 points
  • No alternatives (unique location, family land, heritage significance): 9-10 points

Total holdout risk score:

  • 0-10 points: Low risk (likely to negotiate in good faith)
  • 11-20 points: Moderate risk (may require mediation or premium)
  • 21-30 points: High risk (likely holdout, plan for expropriation)

Example:

Owner A (Parcel A - critical):

  • Motivation: 2 points (willing seller, property already listed)
  • Sophistication: 4 points (knows market value)
  • Alternatives: 2 points (retiring, relocating)
  • Holdout risk: 8/30 (low risk - acquire via negotiation)

Owner B (Parcel B - critical):

  • Motivation: 9 points (ideological opposition to transit project)
  • Sophistication: 8 points (lawyer, knows leverage)
  • Alternatives: 7 points (family business, 40 years at location)
  • Holdout risk: 24/30 (high risk - plan for expropriation from outset)

Negotiation vs. Expropriation Decision Matrix

Framework: Decide for each parcel whether to pursue negotiated purchase or proceed directly to expropriation.

Decision criteria:

Negotiate first (if all of the following):

  • Holdout risk ≤15/30 (low to moderate)
  • Timeline allows 6-18 months for negotiation
  • Owner willing to engage in discussions
  • Market value is clear (comparable sales available)

Expropriate from outset (if any of the following):

  • Holdout risk ≥20/30 (high)
  • Critical parcel + compressed timeline (<12 months)
  • Owner refuses to negotiate or demands >150% of market value
  • Multiple owners with conflicting interests (partition sale unlikely)

Hybrid approach (parallel negotiation + expropriation proceedings):

  • Initiate expropriation process (serves notice, starts timeline)
  • Continue negotiating in good faith
  • If negotiation succeeds: Withdraw expropriation, complete negotiated purchase
  • If negotiation fails: Proceed to expropriation hearing
  • Benefit: Timeline protection while preserving goodwill

Example decision matrix:

ParcelCriticalityHoldout RiskTimelineDecision
ACritical8/30 (low)18 monthsNegotiate first
BCritical24/30 (high)18 monthsExpropriate (hybrid)
CCritical12/30 (moderate)12 monthsExpropriate (hybrid)
DNon-critical15/30 (moderate)24 monthsNegotiate first
GNon-critical18/30 (moderate)36 monthsNegotiate first (defer if needed)

Timeline Optimization (Parallel vs. Sequential Acquisition)

Parallel acquisition (acquire multiple parcels simultaneously):

  • Advantages:

- Faster overall timeline (critical for project delivery) - Prevents owners from learning of others' negotiations (reduces holdout incentive) - Demonstrates project seriousness (signals commitment)

  • Disadvantages:

- Higher upfront costs (staff, appraisals, legal fees) - Risk of overpaying (less ability to use early acquisitions as comparables)

Sequential acquisition (acquire parcels one-by-one):

  • Advantages:

- Lower upfront costs (spread over time) - Learn from early negotiations (refine approach) - Establish precedents (early prices become comparables for later parcels)

  • Disadvantages:

- Longer overall timeline - Holdout risk increases (remaining owners know they have leverage) - Later parcels cost more (owners demand premium as "last holdout")

Optimal strategy (hybrid):

  1. Phase 1 (parallel): Acquire all critical parcels simultaneously

- Prevents holdouts from blocking project - Worth premium cost to secure timeline

  1. Phase 2 (sequential): Acquire non-critical parcels sequentially

- Less time pressure, negotiate better prices - Use Phase 1 prices as comparables

Example timeline:

Months 0-3: Initiate negotiations/expropriation for Parcels A, B, C (critical) - parallel Months 6-12: Complete acquisitions of Parcels A, B, C Months 12-18: Negotiate Parcel D (bus terminal) - sequential Months 18-24: Negotiate Parcels E, F - sequential Months 24-36: Negotiate Parcels G, H (joint development) - sequential, low priority

Station Area Planning Integration

Coordinating property acquisition with broader planning objectives to maximize transit investment and community benefits.

Joint Development Opportunities (Air Rights, Adjacent Parcels)

Methodology: Identify parcels suitable for joint development (mixed-use, TOD) to recover costs and catalyze area transformation.

Air rights development (above station):

  • Feasibility factors:

- Structural capacity (station designed to support building above) - Zoning permits (as-of-right or requires approval) - Market demand (residential, office, retail)

  • Financial model:

- Air rights lease revenue (annual rent from developer) - Upfront capital payment (lump-sum for air rights) - Cost recovery (offset station construction costs)

Example:

  • Station cost: $150M (including structural capacity for overbuild)
  • Air rights: 300,000 sq ft residential development above station
  • Developer payment: $30M upfront + $2M/year ground lease (30 years)
  • NPV of air rights: $30M + ($2M ÷ 6% cap rate) = $30M + $33M = $63M (42% cost recovery)

Adjacent parcel development:

  • Acquire surplus land beyond immediate station needs
  • Develop or sell for TOD (mixed-use, residential, office)
  • Capture land value uplift from transit investment

Example:

  • Acquire: 5 hectares (3 ha for station, 2 ha surplus)
  • Pre-transit value: $5M/ha × 5 ha = $25M
  • Post-transit value (after station opens): $15M/ha × 2 ha (surplus) = $30M
  • Land value capture: $30M - ($5M/ha × 2 ha) = $20M net gain
  • Plus development revenue: Sell to developer or enter joint venture for additional returns

Zoning and Planning Approvals Coordination

Methodology: Align property acquisition with zoning changes to enable TOD and streamline approvals.

Pre-acquisition zoning strategy:

  1. Identify zoning constraints (low-density residential, height limits, parking minimums)
  2. Initiate zoning amendment process before or concurrent with acquisition
  3. Coordinate with municipal planning department (Official Plan amendment, zoning by-law)
  4. Public consultation (integrate with station planning consultation)

Timeline coordination:

  • Optimal: Complete zoning approval before property acquisition

- Benefit: Acquire at lower value (based on existing zoning, not TOD potential) - Risk: Zoning approval may fail, leaving acquisition unjustified

  • Alternative: Acquire first, then rezone

- Benefit: Certainty of land control - Risk: Pay higher price (sellers aware of TOD potential)

Example:

Site: Suburban station area, currently zoned low-density residential (R2 - max 2 storeys) Proposed zoning: Mixed-use, high-density (MU-3 - max 12 storeys, no parking minimums)

Strategy:

  1. Year 1: Initiate Official Plan amendment + zoning by-law (station area plan)
  2. Year 1-2: Acquire properties at current use value (R2 zoning) - $500K-$800K per property
  3. Year 2: Zoning approval (MU-3)
  4. Year 3+: Property values increase to $2M-$3M each (TOD potential realized)
  5. Result: Acquired 15 properties for $10M total, post-zoning value $35M (land value capture)

Community Benefits Packages (Affordable Housing, Parks)

Methodology: Integrate community benefits into station development to secure political support and mitigate displacement impacts.

Affordable housing:

  • Inclusionary zoning: Require 10-25% affordable units in joint developments
  • Direct provision: Transit agency builds affordable housing on surplus lands
  • Example: 500-unit joint development, 20% affordable (100 units) at 80% AMI rents

Parks and public realm:

  • Station plaza: Public gathering space (0.5-1.0 hectare)
  • Green corridors: Pedestrian/cycling connections to station (500m radius)
  • Example: 0.8 ha station plaza + 2 km multi-use trail along transit corridor

Community facilities:

  • Childcare: On-site or adjacent to station (supports working families)
  • Library/community center: Co-locate with station (attract riders, serve community)
  • Example: 200-child daycare in station podium + 1,000 sq m library branch

Local hiring and procurement:

  • Construction jobs: 10-20% local hiring targets
  • Operating jobs: Priority hiring from station area residents
  • Example: 150 construction jobs, 30 local hires; 50 permanent station jobs, 15 local hires

Financial impact:

  • Community benefits cost: $20M-$50M (affordable housing land, park development, facilities)
  • Benefit: Political support, faster approvals, reduced opposition
  • ROI: Difficult to quantify but reduces project risk and enhances ridership

Automated Scoring Calculator

transit_station_scorer.py - Systematic evaluation tool for comparing transit station site alternatives.

Features

5 Scoring Categories (all normalized to 0-100 scale):

  1. TOD Potential (0-100, higher better) - Density, mix, walkability, development potential
  2. Multi-Modal Connections (0-100, higher better) - Bus, bike, pedestrian, parking
  3. Acquisition Complexity (0-100, LOWER better) - Ownership, displacement, environmental
  4. Community Impact (0-100, LOWER better) - Displacement, gentrification, heritage
  5. Holdout Risk (0-30, LOWER better) - Owner motivation, sophistication, alternatives

Composite Scores:

  • Desirability (40% weight): Average of TOD Potential + Multi-Modal
  • Feasibility (40% weight): Inverse of average Complexity + Community Impact
  • Overall (100%): Weighted composite with 4-tier recommendation system

Normalization: Raw component scores normalized to true 0-100 scales for clarity:

  • TOD Potential: Raw max 126.5 → 100
  • Multi-Modal: Raw max 95 → 100
  • Exceptional sites score in high 90s (e.g., 96/100) rather than exceeding 100

Usage

# Score a single site
./transit_station_scorer.py samples/site_a_urban_infill.json

# Input format: JSON with 6 sections
# - site_identification (ID, name, location, station type)
# - tod_characteristics (density, mix, walkability, development)
# - multi_modal_connections (bus, bike, pedestrian, parking)
# - acquisition_complexity (ownership, displacement, environmental, legal)
# - community_impact (displacement, gentrification, heritage, support)
# - holdout_risk (motivation, sophistication, alternatives)

Output: Console report + timestamped JSON file with detailed breakdowns

Sample Sites Available:

  • Site A (Urban Infill): 64.9/100 - High TOD (96) but complex acquisition
  • Site B (Greenfield): 70.7/100 - Low TOD (36) but excellent feasibility
  • Site C (Complex Urban): 44.2/100 - Exceptional TOD (84) but severe challenges
  • Site D (Balanced Suburban): 63.3/100 - Moderate across all categories

Documentation: See README.md for complete methodology, interpretation guide, and examples.


This skill activates when you:

  • Plan complex transit station acquisitions requiring multi-parcel assembly
  • Evaluate alternative station sites using TOD scoring frameworks
  • Assess property acquisition complexity and holdout risk
  • Develop strategic acquisition sequencing (critical vs. non-critical parcels)
  • Decide between negotiation and expropriation for specific parcels
  • Optimize acquisition timelines (parallel vs. sequential strategies)
  • Integrate station planning with joint development, zoning, and community benefits
  • Coordinate stakeholder engagement and community impact mitigation

适合场景

01

用户想查找某类 Agent Skill 时

02

需要根据任务场景推荐可安装能力包时

03

需要对比不同来源的安装命令和来源信息时

04

需要参考平台分布和安装热度时

能力概览

能力 1

按任务关键词查找相关 Skills

能力 2

展示可复制的安装命令

能力 3

保留来源站点、仓库和原始说明,方便继续核验

能力 4

补充不同宿主或平台的使用分布数据

能力 5

展示第三方安全扫描或审计结果

安装后应在对应宿主中按原始 README 的触发条件使用;具体调用方式请以来源页面和 README 为准。

平台分布

Claude Code

30.15%
按下载量换算30

windsurf

24.09%
按下载量换算24

trae

18.36%
按下载量换算18

OpenCode

12.8%
按下载量换算13

Codex

7.45%
按下载量换算7

Antigravity

3.6%
按下载量换算4

安全审计

Gen Agent Trust Hub

通过

Socket

通过

Snyk

通过

权限和风险

执行命令

安装流程涉及命令执行,可能通过 npx skills add https://github.com/reggiechan74/vp-real-estate --skill transit-station-site-acquisition-strategy;npx skills add reggiechan74/vp-real-estate --skill "transit-station-site-acquisition-strategy" 联网下载 Skill 或依赖。用户安装前应确认命令来源、仓库内容和执行环境。

安装前确认

本站仅展示第三方公开信息,不托管安装包,不提供自动安装或运行环境。安装前应自行审查源码、依赖和命令行为。

来源信息

继续浏览同类 Skills