Token导航 LogoToken导航TokenDH.com
开发权限需确认github未标认证来源可访问许可证需确认审计通过

spatial-planning空间规划

Agent Skill

spatial-planning 用于处理 GitHub 仓库、Issue、Pull Request 和代码协作信息,适合在 Codex、Claude、Cursor、Gemini CLI 中需要围绕仓库状态、代码变更或协作事项进行整理时使用。可结合来源仓库、安装命令和原始 README 继续核验具体用法。安装前建议确认权限范围、维护状态,以及是否会触发联网、命令执行或文件读写。

总安装

676

周安装

8

GitHub Stars

158

下载量

65
CodexClaudeCursorGemini CLI

安装说明

本站只整理中文说明和来源信息,不托管安装包,也不代用户安装。

GitHub

来源数

2

许可证

unknown

最后核验

2026-05-01

来源状态

来源可访问

安装方式

通过对话安装

复制提示词发给支持本地命令或 Skills 的 AI 助手,先确认命令和权限,再让它执行。

请帮我安装这个 Agent Skill:spatial-planning(空间规划)
来源仓库:https://github.com/amanbh997/skills-architects
仓库路径:skills/spatial-planning
安装命令:
npx skills add https://github.com/amanbh997/skills-architects --skill spatial-planning
安装前请先检查当前环境是否支持对应 CLI,并向我确认将要执行的命令、安装目录、联网范围和文件读写权限;确认后再执行。

命令行安装

复制命令到本机终端执行。该命令会通过 npx skills 从第三方来源获取 Skill;本站只展示命令,不托管安装包,也不自动执行。

skills.shnpx skills
npx skills add https://github.com/amanbh997/skills-architects --skill spatial-planning

简介

用于处理 GitHub 仓库、Issue、Pull Request 等协作信息,支持项目协同管理。

  • 适合在 Codex、Claude、Cursor、Gemini CLI 中需要围绕代码变更进行整理时使用。
  • 通过 GitHub 安装,建议结合原始 README 了解具体操作流程。
  • 使用前应确认权限范围、维护状态及是否涉及文件读写或网络请求。
  • spatial-planning 属于开发类 Skill,可作为该场景下的辅助能力补充。

SKILL.md

Spatial Planning

Section 1: Floor Plan Archetypes

The floor plan archetype determines nearly every downstream design decision — structural grid, facade rhythm, servicing strategy, daylight penetration, and occupant experience. The ten canonical plan types below cover the full spectrum of building configurations from narrow residential slabs to deep-plan commercial towers.

1.1 Single-Loaded Corridor

Diagram description: A linear building with habitable rooms on one side only and an open corridor or gallery on the other, typically facing a courtyard or exterior view.

  • Typical plan depth: 6–9 m from corridor wall to exterior facade
  • Structural grid: 6–8 m bays perpendicular to corridor, 3–4 m bays parallel
  • Daylight characteristics: Excellent — all rooms have direct exterior exposure on at least one side; corridor receives borrowed light or is open-air
  • Circulation efficiency: Low — corridor serves rooms on one side only, yielding high circulation-to-usable area ratio (NTG penalty 5–10%)
  • Best-fit building types: Tropical housing, student residences, hospital wards, hotels in warm climates, gallery-access social housing
  • Exemplar buildings: Robin Hood Gardens (Alison & Peter Smithson, London, 1972); Park Hill (Jack Lynn & Ivor Smith, Sheffield, 1961)

1.2 Double-Loaded Corridor

Diagram description: A linear building with habitable rooms on both sides of a central corridor, creating a deeper floor plate.

  • Typical plan depth: 12–18 m total (two 6–9 m room depths flanking a 1.5–2.4 m corridor)
  • Structural grid: 6–8 m bays perpendicular, 3–5 m parallel
  • Daylight characteristics: Good in rooms; corridor is typically windowless and requires artificial lighting or periodic breaks with glazing
  • Circulation efficiency: High — corridor serves rooms on both sides, achieving 78–85% NTG in residential, 80–87% in hotel
  • Best-fit building types: Hotels, residential apartments, dormitories, hospital departments, budget office buildings
  • Exemplar buildings: Unite d'Habitation (Le Corbusier, Marseille, 1952); Trellick Tower (Erno Goldfinger, London, 1972)

1.3 Central Core

Diagram description: A floor plate organized around a central vertical core containing stairs, elevators, risers, and often toilets, with usable space radiating outward to the perimeter facade.

  • Typical plan depth: 9–15 m from core face to facade (18–30 m total floor plate dimension)
  • Structural grid: 9 m x 9 m or 10.8 m x 10.8 m typical for office; 8.4 m x 8.4 m for residential
  • Daylight characteristics: Good at perimeter (within 6–8 m of facade); deep zones beyond 8 m require artificial lighting; core zone is dark
  • Circulation efficiency: Excellent — shortest average travel distances, compact service distribution. NTG 75–82% for office
  • Best-fit building types: Office towers, mixed-use high-rises, commercial buildings over 10 storeys
  • Exemplar buildings: Seagram Building (Mies van der Rohe, New York, 1958); Swiss Re (Foster + Partners, London, 2004)

1.4 Side Core

Diagram description: The vertical core is positioned at one end or one side of the floor plate, freeing the remainder for uninterrupted usable space with maximum facade access.

  • Typical plan depth: 12–18 m from core to far facade
  • Structural grid: 9–12 m clear spans common to maximize open floor plate
  • Daylight characteristics: Excellent — core does not obstruct perimeter daylight; deep floor plates still need supplementary lighting beyond 8 m from facade
  • Circulation efficiency: Good — slightly longer travel distances than central core; single direction of egress requires careful code compliance (max 45 m travel distance IBC sprinklered)
  • Best-fit building types: Speculative offices (lettable floor plates), creative workspaces, laboratories, buildings on narrow urban sites
  • Exemplar buildings: Lever House (SOM, New York, 1952); One Angel Court (Fletcher Priest, London, 2017)

1.5 Point Tower

Diagram description: A compact, typically square or circular floor plate with a central or offset core, rising as a slender tower. Small floor plates (400–800 m²) with high perimeter-to-area ratio.

  • Typical plan depth: 6–10 m from core to facade
  • Structural grid: Radial or 6–8 m orthogonal grid
  • Daylight characteristics: Excellent — high perimeter-to-floor-area ratio ensures most space is within 6 m of facade
  • Circulation efficiency: Very high — compact core serves 4–8 units per floor in residential, or open-plan office. NTG 75–82% residential
  • Best-fit building types: Residential towers, boutique office towers, landmark/iconic structures, slender urban infill
  • Exemplar buildings: Barbican Tower (Chamberlin Powell & Bon, London, 1976); Aqua Tower (Studio Gang, Chicago, 2009)

1.6 Courtyard Plan

Diagram description: Building mass encloses or partially encloses a central open courtyard, creating inward-facing as well as outward-facing rooms.

  • Typical plan depth: 6–12 m building depth around 15–40 m courtyard dimension
  • Structural grid: 6–8 m bays; loadbearing masonry or frame
  • Daylight characteristics: Very good — dual-aspect units possible; courtyard provides sheltered daylight source. Courtyard must be min 1:1 width-to-height ratio for adequate light at lower floors
  • Circulation efficiency: Moderate — circulation wraps around courtyard, adding length but creating social/amenity corridor
  • Best-fit building types: Low-to-mid-rise housing (3–8 storeys), institutional (schools, monasteries, museums), hotels, mixed-use urban blocks
  • Exemplar buildings: Palazzo Farnese (Antonio da Sangallo/Michelangelo, Rome, 1534); Beurret & de la Croix housing (Valerio Olgiati, 2014)

1.7 Atrium Plan

Diagram description: A large internal void (atrium) rises through multiple storeys, with occupied floors opening onto galleries or balconies surrounding the void. The atrium is typically top-lit or side-lit.

  • Typical plan depth: 6–12 m from atrium edge to exterior facade; atrium 10–30 m wide
  • Structural grid: Long-span (12–15 m) to clear atrium void; 6–9 m in occupied wings
  • Daylight characteristics: Excellent at upper levels; diminishes at lower floors of deep atria. Atrium acts as light well. Glazed roof or clerestory essential
  • Circulation efficiency: Good — atrium acts as orientation device and social condenser; galleries double as circulation and informal meeting space
  • Best-fit building types: Corporate headquarters, shopping malls, hospitals, museums, civic buildings, hotels
  • Exemplar buildings: Bradbury Building (George Wyman, Los Angeles, 1893); Commerzbank Tower (Foster + Partners, Frankfurt, 1997)

1.8 Free Plan

Diagram description: Structural columns are set back from the facade on a regular grid, with non-loadbearing partitions freely arranged on each floor independently. The floor plan has no fixed interior walls tied to structure.

  • Typical plan depth: Variable — 12–20 m common
  • Structural grid: Regular grid (Dom-ino: 5 m x 5 m); pilotis or columns at ground; flat slabs
  • Daylight characteristics: Dependent on floor plate depth and window placement; facade is free from structural constraint enabling floor-to-ceiling glazing
  • Circulation efficiency: High — absence of loadbearing walls allows optimized corridor placement per floor
  • Best-fit building types: Modernist villas, flexible office space, galleries, retail, adaptable-use buildings
  • Exemplar buildings: Villa Savoye (Le Corbusier, Poissy, 1931); Farnsworth House (Mies van der Rohe, Plano, 1951)

1.9 Open Plan

Diagram description: A large, unpartitioned floor plate with minimal internal walls or divisions, typically with perimeter structure or long-span trusses enabling column-free interiors.

  • Typical plan depth: 18–30 m or more; limited only by daylighting (8 m effective daylit zone from each facade)
  • Structural grid: Long-span: 12–18 m (steel) or 9–12 m (concrete). Post-tensioned slabs common
  • Daylight characteristics: Moderate — perimeter zones well-lit, deep core zones require artificial light. Atriums or lightwells mitigate this
  • Circulation efficiency: Very high — minimal dedicated corridor space; NTG 82–88% achievable
  • Best-fit building types: Trading floors, tech offices, co-working spaces, warehouses, exhibition halls, large retail
  • Exemplar buildings: Willis Faber & Dumas (Foster + Partners, Ipswich, 1975); Centraal Beheer (Herman Hertzberger, Apeldoorn, 1972)

1.10 Hybrid Plan

Diagram description: Combines two or more plan archetypes within a single floor plate or building — for example, a central core office tower with an atrium zone and a double-loaded residential wing.

  • Typical plan depth: Variable — responds to mixed program
  • Structural grid: Transitional grids at junctions; transfer structures where grid changes
  • Daylight characteristics: Varies by zone — each archetype zone retains its own daylight characteristics
  • Circulation efficiency: Moderate — junctions between plan types create circulation complexity; careful wayfinding needed
  • Best-fit building types: Mixed-use developments, large civic buildings, university buildings, transport hubs, hospital complexes
  • Exemplar buildings: Linked Hybrid (Steven Holl, Beijing, 2009); De Rotterdam (OMA, Rotterdam, 2013)

Section 2: Circulation Design

Circulation consumes 15–30% of gross floor area depending on building type. Efficient circulation design directly impacts NTG ratio, user experience, code compliance, and emergency egress.

2.1 Primary Circulation

Lobbies:

  • Main entrance lobbies: min 3.0 m clear height, typically 4.5–6.0 m for commercial
  • Lobby area: 0.5–1.0 m² per person served in peak 5-minute arrival period
  • Elevator lobbies: min 1.5 m depth in front of elevator doors; 2.4 m preferred for office towers
  • Residential entrance lobbies: min 6 m² (BS 9991), concierge desk adds 4–6 m²

Corridors: Minimum corridor widths by building type and code:

Building TypeIBC MinimumBS 9999 MinimumRecommended
Office1118 mm (44 in)1050 mm1500–1800 mm
Residential (common)1118 mm (44 in)1050 mm1200–1500 mm
Hospital2438 mm (96 in)2100 mm2400–3000 mm
School1829 mm (72 in)1600 mm1800–2400 mm
Hotel1118 mm (44 in)1050 mm1350–1500 mm
Retail1118 mm (44 in)1200 mm1800–3000 mm
Assembly1118 mm (44 in)1200 mm2400+ mm

Dead-end corridors (IBC 1020.4):

  • Unsprinklered: max 6.1 m (20 ft)
  • Sprinklered: max 15.2 m (50 ft)
  • Group I-3 (detention): 15.2 m max regardless
  • Exception: single-exit dwelling units per IBC 1006.3.4

Travel distance limits (IBC Table 1017.2):

  • Unsprinklered: 60 m (200 ft) for most occupancies; 23 m (75 ft) for H-1/H-2 hazardous
  • Sprinklered: 76 m (250 ft) for most; 30 m (100 ft) for H-1/H-2
  • Common path of egress: 23 m unsprinklered / 23 m sprinklered for most; 30 m for B/F/S/U occupancies (sprinklered)

2.2 Stair Design

IBC Requirements (Chapter 10):

  • Minimum width: 1118 mm (44 in) for occupant load >50; 914 mm (36 in) for ≤50
  • Riser height: min 102 mm (4 in), max 178 mm (7 in)
  • Tread depth: min 279 mm (11 in)
  • Riser-tread relationship: 2R + T = 600–640 mm (optimum 630 mm)
  • Uniform risers within a flight: max 9.5 mm (3/8 in) variation
  • Maximum flight height without landing: 3.66 m (12 ft)
  • Landing depth: min equal to stair width, need not exceed 1220 mm (48 in)
  • Headroom: min 2032 mm (80 in) measured vertically from nosing

Handrail requirements (IBC 1014):

  • Height: 864–965 mm (34–38 in) measured from nosing
  • Graspable: circular cross-section 32–51 mm (1.25–2 in) diameter or equivalent
  • Extensions: 305 mm (12 in) beyond top riser, one tread depth + 305 mm beyond bottom riser
  • Both sides required for stairs ≥1118 mm wide
  • Intermediate handrail required when stair width exceeds 1524 mm (60 in) with no handrail within 762 mm (30 in)

Accessible stairs (ADA/IBC 1009):

  • Max riser 178 mm, min tread 279 mm
  • Nosing: max 38 mm projection, radius max 13 mm, angled max 60 degrees from horizontal
  • Tactile warning strips at top landing of exterior stairs

Stair capacity:

  • IBC capacity factor: 7.6 mm (0.3 in) per person for stairs (IBC Table 1005.1)
  • A 1118 mm stair serves: 1118 / 7.6 = 147 persons per storey
  • For phased evacuation (BS 9999): stair capacity = stair width (mm) / 5.2 mm per person = flow rate per minute
  • Typical stair flow rate: 60–80 persons per metre width per minute (downward)

2.3 Elevator Design

Cab sizes (EN 81-70 / ASME A17.1):

DesignationCapacityInternal (W x D mm)Shaft (W x D mm)Door (W mm)
6-person450 kg1100 x 14001650 x 1900800
8-person630 kg1600 x 14002150 x 1900900
13-person1000 kg2000 x 14002550 x 19001100
16-person1275 kg2000 x 16002550 x 21001100
21-person1600 kg2100 x 18002650 x 23001300
Bed elevator2500 kg2400 x 27002900 x 32001300
Firefighter1000 kg min1100 x 2100 minper shaft1100

Waiting time targets (CIBSE Guide D):

  • Premium office: 20–25 s average waiting time
  • Standard office: 25–30 s
  • Residential: 40–60 s (up-peak less critical)
  • Hotel: 30–45 s
  • Hospital (bed): 60–90 s (dedicated bed lifts)
  • Quality of service: >90% of passengers served within target wait time

Elevator quantity estimation (rule of thumb):

  • Office: 1 elevator per 2,500–3,500 m² GFA per zone
  • Residential: 1 elevator per 60–90 units (min 2 per core)
  • Hotel: 1 elevator per 100–150 rooms
  • Hospital: complex traffic analysis required; typically 1 bed lift per 100 beds + visitor/staff lifts

Elevator speed by building height:

  • Low-rise (≤10 storeys): 1.0–1.75 m/s
  • Mid-rise (10–25 storeys): 2.5–4.0 m/s
  • High-rise (25–50 storeys): 5.0–7.0 m/s
  • Supertall (50+ storeys): 8.0–10.0 m/s (sky lobbies with express + local)

2.4 Escalator Design

  • Standard width: 600 mm (single file) or 1000 mm (two abreast)
  • Inclination: 30 degrees (standard), 35 degrees (compact, lower capacity)
  • Speed: 0.5 m/s (standard), 0.65 m/s (high traffic)
  • Capacity: 600 mm @ 0.5 m/s = ~4,500 persons/hour; 1000 mm @ 0.5 m/s = ~6,750 persons/hour
  • Horizontal run at top and bottom: min 800 mm (0.8 m) flat steps
  • Headroom: min 2300 mm vertical clearance
  • Rise: typically 3.0–6.0 m per escalator (single storey); structural opening ~1.6 m wide x 6–12 m long
  • Escalator pairs (up/down) require structural opening 3.5 m wide minimum

2.5 Emergency Circulation (Egress)

  • Minimum 2 exits required when occupant load >49 (IBC 1006.2.1) or building >1 storey
  • Half-diagonal rule: two exits must be separated by distance ≥ 1/2 the maximum diagonal of the floor (IBC 1007.1.1); 1/3 diagonal if sprinklered
  • Exit discharge: directly to public way or through exit passageway; max 50% through building interior if sprinklered (IBC 1028.1)
  • Areas of rescue assistance: required at each stair for buildings without full sprinkler system; min 760 mm x 1220 mm clear space per wheelchair
  • Protected corridors: fire-rated 30/60 minutes depending on building height and sprinkler status

Section 3: Core Design

The vertical core is the organizational spine of any multi-storey building. It concentrates vertical circulation, fire escape routes, and service risers into a compact zone that repeats floor-to-floor.

3.1 Core Types

Central Core:

  • Location: geometric center of floor plate
  • Max floor plate efficiency: shortest average travel distances
  • Typical for: office towers, commercial high-rises
  • Core area: typically 20–28% of gross floor plate for office towers
  • Advantage: equal facade access on all sides
  • Disadvantage: deep floor plates can exceed daylight limits; inflexible for tenant subdivision

Side Core:

  • Location: one end or one side of floor plate
  • Typical for: speculative office, labs, creative workspace
  • Core area: typically 18–25% of gross floor plate
  • Advantage: uninterrupted usable floor plate, flexible tenant layouts, views unobstructed
  • Disadvantage: longer travel distances to far end; potential egress code issue if single core

Dual Core:

  • Location: cores at both ends of a long floor plate
  • Typical for: long-span buildings, hospitals, large floor plates >2,500 m²
  • Core area: 2 x 12–15% = 24–30% of gross floor plate
  • Advantage: meets travel distance limits on long floor plates, redundancy in egress
  • Disadvantage: duplicated elevator lobbies, additional shaft space

Distributed Cores:

  • Location: multiple small cores across a campus or large floor plate
  • Typical for: campus buildings, shopping centers, hospitals, airports
  • Core area: varies; each core typically 50–150 m²
  • Advantage: local servicing, short travel distances, incremental construction
  • Disadvantage: total core area exceeds consolidated core approach; more risers to coordinate

3.2 Core Components

Every core typically contains:

  1. Stairs: Min 2 per building >1 storey (IBC 1006.3). 1-hour fire rating for buildings ≤4 storeys, 2-hour for >4 storeys (IBC 1023.2). Pressurized to 50 Pa positive in tall buildings.
  2. Elevators: Passenger, goods, firefighter. Shaft: 2-hour fire rating (IBC 3006.2). Machine room or machine-room-less (MRL).
  3. Service risers:

- Electrical: 600 mm x 400 mm min per riser for typical office floor; increases with building height and load - Data/telecoms: 400 mm x 400 mm min; separate from electrical for EMI - Water (potable + fire): 300 mm x 300 mm min; wet riser diameter 100–150 mm - Waste (soil + vent): 150 mm dia soil stack per bathroom group + 100 mm vent - HVAC: vertical ductwork risers 600 mm x 1200 mm typical for office floors; or AHU per floor eliminating vertical duct risers - Gas: where applicable, in fire-rated enclosure

  1. Toilets: Typically adjacent to core for riser access; stacking is essential
  2. Lobby/waiting area: Elevator lobby min 1.5 m depth; 2.4 m preferred for commercial
  3. Refuse/recycling chute: 500 mm dia min, fire-rated enclosure, ground floor collection room

3.3 Core Dimensioning by Building Type

Residential tower (20 storeys, 8 units/floor):

  • Single stair per core (where code allows, e.g., UK for <11 m above ground) or 2 stairs
  • 2 elevators (1 x 13-person + 1 x 8-person)
  • Core area: approximately 40–55 m² per floor
  • Core as % of floor plate (600 m² GFA): 7–9%

Office tower (30 storeys, 1,500 m² floor plate):

  • Central core with 2 stairs (each 1200 mm wide min)
  • 6–8 elevators in 2 banks (low-rise + high-rise zones for >20 storeys)
  • Core area: approximately 300–400 m² per floor
  • Core as % of floor plate: 20–27%

Hospital (8 storeys, 3,000 m² floor plate):

  • Dual cores at building ends
  • 2 stairs per core + 2 bed elevators + 2 passenger elevators per core
  • Core area: 2 x 150–200 m² = 300–400 m²
  • Core as % of floor plate: 10–13%

3.4 Core-to-Facade Distances

  • Daylighting limit: Usable daylight penetration approximately 2x–2.5x the head height of the window. For a 2.7 m floor-to-ceiling height, daylight effective to 5.4–6.75 m. Design target: max 8 m from facade for occupied space (LEED/BREEAM daylight criteria)
  • Travel distance (IBC): Max 76 m to nearest exit (sprinklered). Max 45 m common path of egress in most occupancies. This limits core-to-furthest-point distance.
  • Structural efficiency: Core acts as shear wall/braced frame for lateral loads. Central core optimal for torsional resistance. Offset cores require supplementary lateral systems (outriggers, belt trusses).

Section 4: Vertical Stacking Strategy

4.1 Principles

Vertical stacking organizes building programs floor-by-floor to optimize:

  • Structural continuity (column grids aligning vertically)
  • Service riser alignment (wet zones stacked directly above each other)
  • Functional adjacency (related uses on adjacent floors)
  • Value capture (premium uses at upper levels for views)
  • Code compliance (different occupancy classifications per floor may trigger separations)

4.2 Heavy and Wet Use Stacking

Stacking rule: All kitchens, toilets, laboratories, laundries, and plant rooms should stack vertically to align plumbing risers and drainage.

  • Soil stacks require gravity fall: min 1:40 gradient in horizontal runs, vertical drops align
  • Horizontal offsets in soil stacks: max 2 m lateral displacement per offset with access panels
  • Water supply risers: stacked to minimize pipe runs and maintain pressure (boosted systems above 10 storeys typical)
  • Kitchen extract risers: must be stacked and fire-rated (grease duct 2-hour rating)

4.3 Column Grid Continuity

  • Ideal: consistent column grid from foundation to roof
  • Transfer structures: required where grid changes (e.g., parking grid 7.5 x 15 m to residential 6 x 8 m). Transfer beams/slabs: typically 1.0–2.5 m deep, 2–3x cost of normal floor structure
  • Minimizing transfers: align at least primary columns through all levels; allow secondary column shifts
  • Column-free ground floor: common for retail/lobby; achieved via transfer beam at level 1 or mega-columns

4.4 Typical Stacking Patterns

Mixed-use tower (bottom to top):

  1. Basement 2–3: Parking, building plant (chillers, boilers, generators, water tanks), refuse store
  2. Basement 1: Parking, cycle store, building management suite
  3. Ground floor: Retail units, entrance lobbies, concierge, back-of-house
  4. Level 1 (podium): Retail/F&B, or amenity deck
  5. Levels 2–3 (podium): Parking structure or office
  6. Level 4 (transfer): Plant floor / amenity floor
  7. Levels 5–20: Office floors
  8. Level 21: Sky lobby / transfer floor (mechanical, amenity)
  9. Levels 22–45: Residential apartments
  10. Roof: Plant (cooling towers, PV arrays, BMU)

Key stacking considerations:

  • Parking below occupied floors: requires fire separation (2-hour floor) and mechanical ventilation
  • Residential above office: separate elevator banks; residential elevators bypass office floors
  • Plant floors: at base, mid-height (mechanical), and roof; mid-height plant reduces riser sizes
  • Mixed occupancy separations: IBC Table 508.4 required fire separation between uses

Section 5: Net-to-Gross Optimization

5.1 Definition

Net area (NIA/NFA): Usable occupied floor area measured to the internal face of external walls, excluding cores, structure, risers, corridors, plant, and walls.

Gross area (GIA/GFA): Total floor area measured to the external face of external walls, including everything.

Net-to-gross ratio (NTG) = Net / Gross x 100%

5.2 NTG Targets by Building Type

Building TypePoorTypicalGoodExcellent
Residential (apartments)<75%78–80%80–83%83–85%
Office (speculative)<72%75–78%78–80%80–82%
Office (owner-occupied)<70%72–75%75–78%78–80%
Hotel<58%60–63%63–66%66–68%
Hospital<52%55–58%58–60%60–62%
School<60%62–65%65–68%68–70%
Retail<80%82–85%85–88%88–90%
Laboratory<55%58–62%62–65%65–68%

5.3 Strategies for Improving NTG

  1. Minimize corridor length: Double-loaded corridors serve 2x the area of single-loaded. Eliminate dead-end corridors. Use open-plan where program allows.
  2. Combine circulation with amenity: Corridors that widen into break-out spaces, lobbies that serve as informal meeting areas — these serve dual function and reduce perceived waste.
  3. Right-size cores: Over-engineering vertical transportation wastes lettable area. Traffic analysis (simulation-based, not rule-of-thumb) can save 1–3% NTG.
  4. Reduce structural footprint: Post-tensioned flat slabs eliminate drop beams and allow thinner structural zones, reducing floor-to-floor height and enabling additional floors within the same building height.
  5. Stack service risers: Misaligned risers between floors create horizontal distribution runs that consume ceiling void and floor area. Perfect stacking eliminates horizontal diversions.
  6. Efficient toilet layouts: Back-to-back toilet blocks sharing a common riser wall save 10–15% compared to dispersed facilities.
  7. Avoid unnecessary common areas: Each common area (mail rooms, storage, secondary lobbies) reduces NTG. Consolidate where possible.
  8. Facade efficiency: Thick wall build-ups (500+ mm) reduce NIA relative to GIA by 3–5% compared to thin envelope systems (200 mm curtain wall).

5.4 Economic Impact

  • In a commercial office building at $600/m² annual rent:

- 1% improvement in NTG on 20,000 m² GFA = 200 m² additional NIA - Annual rent gain = 200 x $600 = $120,000/year - At 5% yield = $2,400,000 capital value increase

  • NTG optimization is the single highest-leverage design decision for developer profitability

Section 6: Wayfinding and Spatial Legibility

6.1 Principles

Effective wayfinding relies on the legibility of the architecture itself — not on signage as a corrective measure for poor spatial design. Kevin Lynch's five elements of urban legibility (paths, edges, districts, nodes, landmarks) apply at building scale:

  • Paths: Corridors, walkways, and circulation routes that are clearly defined by floor finish, ceiling height, or lighting character
  • Edges: Thresholds between public and private, indoor and outdoor, circulation and destination
  • Districts: Recognizable zones within a building — each department, wing, or floor should have distinct spatial identity through material, color, light quality, or ceiling height
  • Nodes: Decision points — stair lobbies, corridor intersections, elevator halls — that require clear spatial hierarchy to orient the user
  • Landmarks: Distinctive architectural features visible from multiple locations — a sculptural stair, a double-height space, a view to a specific external landmark, a skylight

6.2 Architectural Wayfinding Strategies

Clear sightlines to vertical circulation:

  • Elevator lobbies visible from the main entrance
  • Stairs announced by generous openings, natural light, or atrium exposure
  • Avoid hidden stairs — visibility encourages use and aids emergency egress

Landmark moments at decision points:

  • At every point where a user must choose a direction, provide a distinguishing spatial event: a change in ceiling height, a view out, a material change, a water feature
  • The strength of the landmark should be proportional to the importance of the decision

Differentiation through light:

  • Corridors lit from one end create a natural gradient — users move toward the light
  • Side-lit corridors with intermittent windows provide orientation (external views confirm location)
  • Top-lit spaces (atriums, skylights) serve as orientation anchors within deep-plan buildings

Differentiation through height:

  • Primary circulation routes: 3.0–4.5 m ceiling height
  • Secondary routes: 2.7–3.0 m
  • Destinations (offices, rooms): 2.4–2.7 m
  • Compression and release: lowering a ceiling before a tall space heightens arrival experience

Differentiation through material:

  • Floor material changes at thresholds signal transition between zones
  • Acoustic character (hard vs. soft surfaces) distinguishes circulation from occupation
  • Color coding by floor or wing — subtle architectural color, not painted wayfinding stripes

6.3 Signage Integration

When signage is necessary, it should complement the architecture:

  • Consistent sign family: typeface, color, mounting height, illumination
  • Decision-point signs at corridor intersections, elevator lobbies, stair entries
  • Confirmation signs along routes confirming correct path
  • Identification signs at destinations (room numbers, department names)
  • Regulatory signs (exit, fire, accessibility) per code requirements
  • Digital wayfinding: interactive kiosks at main entry points for complex buildings (hospitals, airports)

6.4 Universal Accessibility in Wayfinding

  • Tactile ground surface indicators (TGSIs) at stair landings, platform edges, and hazards
  • Braille and raised lettering on room identification signs (ADA: 1220–1524 mm above floor, latch side of door)
  • Audible wayfinding for visually impaired: elevator announcements, audible beacons at key locations
  • Color contrast: 30-point minimum LRV difference between walls and floors, doors and frames, signs and backgrounds
  • Cognitive accessibility: simple, consistent spatial layout reduces confusion for neurodiverse users

6.5 Wayfinding in Complex Building Types

Hospitals:

  • Main street spine with departments branching off
  • Color-coded zones per department
  • Clear separation of public, patient, staff, and goods routes
  • Visitor wayfinding starts at car park, continues to reception, extends to ward/department

Airports:

  • One-way flow from landside to airside
  • Progressive disclosure: only show next decision, not all decisions at once
  • Moving walkways as path reinforcement
  • Gate numbering systems with visual distance cues

Universities:

  • Campus-scale wayfinding linking buildings
  • Building-scale wayfinding linking departments
  • Room-scale wayfinding linking individual spaces
  • Consistent numbering: building code + floor + room sequence (e.g., ENG-3-014)

Shopping centers:

  • Anchor stores at ends of routes (magnets)
  • Visibility across voids for orientation
  • Consistent directory kiosks at all vertical circulation points
  • Clear back-of-house / front-of-house separation

High-rise residential:

  • Ground floor: concierge/reception as first orientation point
  • Elevator lobby: clear numbering at each floor, visible immediately on exiting elevator
  • Corridors: apartment numbering logical and sequential (clockwise from elevator)
  • Dual-aspect corridors with windows at ends preferred for orientation
  • Mail/parcel rooms and amenity spaces as secondary landmarks

6.6 Quantifying Wayfinding Performance

Wayfinding effectiveness can be measured through:

  • Decision point density: Number of directional choices per 100 m of path. Target: <3 for simple buildings, <5 for complex
  • Sightline distance: Average distance at which the next decision point or destination is visible. Longer sightlines = better legibility. Target: >15 m in primary circulation
  • Route directness ratio: Actual walking distance / straight-line distance. Target: <1.5 for primary routes
  • First-visit success rate: Percentage of first-time visitors reaching destination without asking for help. Target: >85%
  • Average navigation time: Time to reach destination from entrance vs. minimum possible time. Target: <1.5x minimum

Appendix: Key Standards and References

StandardScopeJurisdiction
IBC (International Building Code)Egress, travel distance, stair/elevator requirementsUSA (adopted by most states)
NFPA 101 (Life Safety Code)Egress, occupant load, fire protectionUSA (alternative to IBC)
BS 9999Fire safety design, escape routes, travel distancesUK
Approved Document BFire safety in buildingsEngland & Wales
Approved Document KStairs, ramps, guards, protection from fallingEngland & Wales
Approved Document MAccess to and use of buildings (accessibility)England & Wales
DIN 18065Stairs in buildings — terminology, dimensionsGermany
DIN 18040-1/2Accessible design (public / residential)Germany
BS 8300Design of accessible and inclusive built environmentUK
ADA StandardsAccessibility in public accommodationsUSA
CIBSE Guide DVertical transportation (elevator design)UK / international
EN 81-20/50Elevator safety — construction and installationEurope
EN 81-70Accessibility of elevators for persons with disabilityEurope
BS 6465-1Sanitary provision — quantity and dimensionsUK
Neufert Architects' DataDimensional reference for all building typesInternational
Kevin Lynch, "The Image of the City" (1960)Spatial legibility theoryAcademic reference

Space Planning Rules of Thumb

ParameterValueSource
Minimum ceiling height (habitable room)2400 mm (IBC); 2300 mm (UK)Building codes
Minimum bedroom area6.5 m² single, 11.0 m² double (UK NDSS)National space standards
Minimum 1-bed apartment area50 m² (UK NDSS); 37 m² (NYC HPD)Local standards
Corridor to usable area ratio (office)12–18%Industry benchmark
Elevator lobby area per elevator4–6 m²CIBSE Guide D
Stair area (1200 mm wide, per floor)14–18 m² (including half-landings)Calculation
Toilet block per floor (office, 200 occ)30–45 m²BS 6465
Server/comms room per office floor6–12 m²IT planning guides
Cleaners store per floor3–5 m²Facilities management

Daylight and Plan Depth Relationship

Floor-to-Ceiling Height (m)Effective Daylight Depth (m)Room Depth-to-Height Ratio
2.44.8–6.02.0–2.5x
2.75.4–6.752.0–2.5x
3.06.0–7.52.0–2.5x
3.57.0–8.752.0–2.5x
4.08.0–10.02.0–2.5x
4.5 (double height)9.0–11.252.0–2.5x

For spaces deeper than 2.5x the window head height, supplementary daylighting strategies are needed: lightshelves, clerestory windows, borrowed light, rooflights, or atrium/lightwell access. BREEAM/LEED typically require a minimum average daylight factor of 2% in occupied spaces and sDA (spatial daylight autonomy) of 55% for 300 lux for at least 50% of regularly occupied area.

适合场景

01

用户想查找某类 Agent Skill 时

02

需要根据任务场景推荐可安装能力包时

03

需要对比不同来源的安装命令和来源信息时

能力概览

能力 1

按任务关键词查找相关 Skills

能力 2

展示可复制的安装命令

能力 3

保留来源站点、仓库和原始说明,方便继续核验

能力 4

展示第三方安全扫描或审计结果

安装后应在对应宿主中按原始 README 的触发条件使用;具体调用方式请以来源页面和 README 为准。

平台分布

Codex

37.38%
按下载量换算24

Claude

26.49%
按下载量换算17

Cursor

17.93%
按下载量换算12

Gemini CLI

8.8%
按下载量换算6

安全审计

Gen Agent Trust Hub

通过

Socket

通过

Snyk

通过

权限和风险

权限需确认

当前来源未能明确判断权限范围,默认进入异常复核队列。

安装前确认

本站仅展示第三方公开信息,不托管安装包,不提供自动安装或运行环境。安装前应自行审查源码、依赖和命令行为。当前只有一个来源,正式发布前建议补源仓库或其他目录站核验。

来源信息

继续浏览同类 Skills