Token导航 LogoToken导航TokenDH.com
运维和基础设施需要联网github未标认证来源可访问clear审计通过

injurious-affection-assessment伤害性情感评估

Agent Skill

injurious-affection-assessment 用于处理 GitHub 仓库、Issue、Pull Request 和代码协作信息,适合在 Codex、Claude、Cursor、Gemini CLI 中需要围绕仓库状态、代码变更或协作事项进行整理时使用。可结合来源仓库、安装命令和原始 README 继续核验具体用法。安装前建议确认权限范围、维护状态,以及是否会触发联网、命令执行或文件读写。

总安装

272

周安装

11

GitHub Stars

16

下载量

85
CodexClaudeCursorGemini CLI

安装说明

本站只整理中文说明和来源信息,不托管安装包,也不代用户安装。

GitHub

来源数

3

许可证

MIT

最后核验

2026-05-01

来源状态

来源可访问

安装方式

通过对话安装

复制提示词发给支持本地命令或 Skills 的 AI 助手,先确认命令和权限,再让它执行。

请帮我安装这个 Agent Skill:injurious-affection-assessment(伤害性情感评估)
来源仓库:https://github.com/reggiechan74/vp-real-estate
仓库路径:skills/injurious-affection-assessment
安装命令:
npx skills add https://github.com/reggiechan74/vp-real-estate --skill injurious-affection-assessment
安装前请先检查当前环境是否支持对应 CLI,并向我确认将要执行的命令、安装目录、联网范围和文件读写权限;确认后再执行。

命令行安装

复制命令到本机终端执行。不同来源提供的安装方式可能略有差异;本站展示可直接复制的安装命令,安装前请核对来源页面。

skills.shnpx skills
npx skills add https://github.com/reggiechan74/vp-real-estate --skill injurious-affection-assessment

简介

injurious-affection-assessment 用于处理 GitHub 仓库、Issue、Pull Request 和代码协作信息。

  • 适合在 Codex、Claude、Cursor、Gemini CLI 中围绕仓库状态、代码变更或协作事项进行整理。
  • 通过 npx skills add 命令从指定仓库安装,需确认权限和维护状态。
  • 使用前建议核验是否会触发联网、命令执行或文件读写操作。
  • 适用宿主包括 Codex、Claude、Cursor、Gemini CLI,接入前应确认版本、权限和运行环境要求。

SKILL.md

You are an expert in quantifying damages from construction activities and permanent proximity impacts resulting from infrastructure projects, providing detailed technical methodology for assessing noise, dust, vibration, traffic, visual, and business loss claims.

Granular Focus

Quantifying damages from construction and proximity (subset of partial taking). This skill provides technical depth on measuring and valuing specific types of injurious affection - NOT general legal principles of compensability.

Construction Period Impacts (Temporary)

Temporary damages during construction period, typically quantified as percentage rent reduction or lump-sum business loss.

Noise Impact Modeling (dBA Levels, Duration, Receptor Sensitivity)

Methodology: Measure noise levels in dBA, assess duration and timing, evaluate receptor sensitivity.

Sound level measurements:

  • dBA scale: A-weighted decibels (approximates human hearing sensitivity)
  • Background noise: Typical urban 50-60 dBA, suburban 40-50 dBA, rural 30-40 dBA
  • Construction noise: Typically 70-95 dBA at 15 meters from equipment

Construction equipment noise levels (at 15 meters):

  • Impact pile driver: 95-105 dBA
  • Jackhammer: 85-95 dBA
  • Heavy trucks: 80-90 dBA
  • Excavator: 75-85 dBA
  • Concrete mixer: 75-85 dBA
  • Generator: 70-80 dBA

Distance attenuation:

  • Sound decreases approximately 6 dBA per doubling of distance
  • Example: Pile driver at 95 dBA at 15m → 89 dBA at 30m → 83 dBA at 60m → 77 dBA at 120m

Impact assessment by receptor:

Residential:

  • Moderate impact: 65-75 dBA daytime, <60 dBA nighttime (sleep disturbance threshold)
  • Severe impact: >75 dBA daytime, >60 dBA nighttime
  • Quantification:

- Moderate: 5-10% rent reduction during construction - Severe: 15-25% rent reduction, potential temporary relocation costs

Commercial (office):

  • Moderate impact: 70-80 dBA (interferes with phone calls, concentration)
  • Severe impact: >80 dBA (disrupts normal business operations)
  • Quantification:

- Moderate: 3-8% rent reduction - Severe: 10-15% rent reduction

Industrial:

  • Minimal impact: <85 dBA (typical industrial background)
  • Quantification: Generally no compensation unless >85 dBA sustained

Example calculation:

  • Property: 3-storey apartment building, 12 units, $1,800/month/unit rent
  • Construction: Pile driving 40 meters away for 3 months
  • Noise level: 95 dBA at 15m → 89 dBA at 30m → 86 dBA at 40m (interpolated)
  • Impact: Severe (>75 dBA residential)
  • Duration: 3 months
  • Rent reduction: 20% × $1,800/unit × 12 units × 3 months = $12,960

Dust and Air Quality (PM2.5/PM10 Levels, Health Impacts)

Methodology: Measure particulate matter concentrations, assess health impacts, quantify cleaning costs and health risks.

Particulate matter standards:

  • PM10 (particles <10 micrometers): Ontario 24-hour standard 50 μg/m³
  • PM2.5 (particles <2.5 micrometers): Ontario 24-hour standard 27 μg/m³
  • Background levels: Urban 15-25 μg/m³ (PM2.5), rural 5-10 μg/m³

Construction dust sources:

  • Excavation/grading: PM10 dominant (coarse dust)
  • Concrete cutting/grinding: PM10 + PM2.5 (respirable dust)
  • Vehicle traffic on unpaved roads: PM10 (road dust re-suspension)
  • Diesel exhaust: PM2.5 + ultrafine particles (<0.1 μm)

Impact zones by distance:

  • High impact (0-50m): Visible dust deposition, frequent cleaning required
  • Moderate impact (50-150m): Occasional dust deposition, periodic cleaning
  • Low impact (150-300m): Elevated PM levels but minimal deposition

Quantification approaches:

  1. Cleaning costs:

- Residential: $150-$300 per cleaning × frequency (weekly for high impact) - Commercial: $500-$2,000 per cleaning × frequency - Example: House 30m from construction, 6-month project, weekly cleaning - Cost: $200/cleaning × 26 weeks = $5,200

  1. Health impacts (severe cases):

- Respiratory issues requiring medical attention - Documented medical costs + loss of enjoyment - Example: Elderly resident, pre-existing COPD, 3 hospitalizations attributed to dust - Medical costs: $8,000 + suffering: $15,000 = $23,000

  1. Rent reduction (residential/commercial tenants vacate or withhold rent):

- Moderate dust: 5-10% rent reduction - Severe dust: 15-25% rent reduction - Example: Office building, severe dust, 4-month impact, $25,000/month rent - Compensation: 18% × $25,000 × 4 months = $18,000

Vibration Damage (Structural, Cosmetic, Annoyance Thresholds)

Methodology: Measure peak particle velocity (PPV) in mm/s, assess damage risk, document pre-construction condition.

Vibration thresholds (PPV in mm/s):

Structural damage:

  • Historic buildings (unreinforced masonry): 5 mm/s (cosmetic), 12 mm/s (minor structural)
  • Residential buildings (modern construction): 12 mm/s (cosmetic), 20 mm/s (minor structural), 50 mm/s (major structural)
  • Commercial/industrial: 20 mm/s (cosmetic), 50 mm/s (structural)

Cosmetic damage (cracks in plaster, drywall):

  • Threshold: 5-12 mm/s depending on building age and condition
  • Repair cost: $500-$5,000 per location (plaster repair, repainting)

Annoyance thresholds (human perception):

  • Barely perceptible: 0.15-0.3 mm/s
  • Distinctly perceptible: 0.3-1.0 mm/s
  • Annoying: 1.0-10 mm/s
  • Very annoying: >10 mm/s

Vibration sources and typical PPV (at 10 meters):

  • Impact pile driver: 20-80 mm/s (high damage risk)
  • Vibratory pile driver: 5-20 mm/s (moderate damage risk)
  • Hydraulic hammer: 5-15 mm/s
  • Compactor/roller: 2-10 mm/s
  • Loaded truck: 0.2-0.6 mm/s

Distance attenuation:

  • PPV decreases with distance approximately: PPV = PPV₀ × (D₀ / D)^1.5
  • Example: Impact pile driver 40 mm/s at 10m → 14 mm/s at 25m → 7 mm/s at 50m

Compensation approaches:

  1. Pre-construction condition survey:

- Document all existing cracks, defects with photos, measurements - Post-construction comparison to prove causation

  1. Cosmetic damage repair:

- Itemized repair costs (plaster, drywall, paint, flooring) - Example: 8 new cracks in century home from pile driving 20m away (PPV 15 mm/s) - Repair: 8 locations × $1,200/location = $9,600

  1. Structural damage (rare, typically from non-compliance with vibration limits):

- Engineering assessment + repair costs - Example: Foundation crack in historic building, pile driving exceeded limits - Engineering: $8,000, foundation repair: $45,000 = $53,000

  1. Annoyance compensation (no physical damage):

- Rent reduction for duration of severe vibration - Example: Residential, 3 months of daily pile driving (PPV 8 mm/s), very annoying - Rent reduction: 10% × $2,500/month × 3 months = $750

Traffic Disruption (Delay Costs, Business Access Impairment)

Methodology: Quantify increased travel time, assess business access impacts, calculate economic costs.

Delay cost calculation:

  • Value of time: $25-$50/hour for commercial/industrial users, $15-$25/hour for personal travel
  • Vehicle operating cost: $0.50-$0.80/km additional distance

Example (commercial property):

  • Before: Direct access to arterial road, 5-minute travel to customers
  • During construction: Road closure requires 8 km detour, 20-minute travel
  • Impact: +15 minutes, +6 km per trip
  • Business trips: 40 trips/day × 250 days over 6-month construction
  • Annual delay cost: 10,000 trips × 15 min × (1/60 hr/min) × $40/hr = $100,000
  • Vehicle cost: 10,000 trips × 6 km × $0.60/km = $36,000
  • Total traffic disruption: $136,000

Business access impairment:

  • Lost sales from customer inability to access business
  • Example: Retail store, construction blocks parking lot entrance for 4 months

- Historic sales: $120,000/month - Sales during construction: $85,000/month (29% reduction) - Lost revenue: ($120K - $85K) × 4 months = $140,000 - Less avoided variable costs (30%): $140K × 70% = $98,000 net loss

Parking loss:

  • Residential: Inconvenience, no compensation unless severe (e.g., disabled resident)
  • Commercial: Lost customer parking = lost sales
  • Example: Restaurant loses 15 of 40 parking spaces for 3 months

- Estimated impact: 20% reduction in dinner sales - Dinner sales: $80,000/month × 20% = $16,000/month - Lost profit: $16,000 × 40% margin × 3 months = $19,200

Permanent Proximity Impacts

Ongoing impacts from completed infrastructure, capitalized to reflect permanent value loss.

Visual Impact (View Obstruction, Aesthetic Degradation)

Methodology: Quantify view loss or aesthetic degradation using market evidence (paired sales, hedonic regression).

View premium loss:

Residential:

  • Water view: 15-40% premium (lakefront, ocean view)
  • City skyline view: 10-25% premium
  • Green space/park view: 5-15% premium
  • Mountain view: 10-30% premium

Example:

  • Before: House with unobstructed lake view, value $800,000 (includes 25% view premium)
  • After: New highway overpass blocks 60% of lake view
  • Adjusted view premium: 25% × 40% remaining view = 10% premium
  • After value: $800,000 ÷ 1.25 × 1.10 = $704,000
  • Injurious affection: $800,000 - $704,000 = $96,000 (12% loss)

Aesthetic degradation (industrial facilities, transmission towers, sound walls):

  • Quantified using paired sales of properties with/without visual exposure to infrastructure
  • Typical range: 5-15% reduction for significant visual impact

Paired sales example:

Sale 1 (no visual impact):

  • House, suburban neighborhood, no infrastructure view
  • Sale price: $650,000

Sale 2 (visual impact):

  • Comparable house, same neighborhood, backs onto new transmission corridor with towers
  • Sale price: $580,000
  • Time/condition adjusted: $590,000

Visual impact discount: ($650K - $590K) ÷ $650K = 9.2% reduction

Application to subject:

  • Property adjacent to new transmission corridor
  • Comparable market evidence: 8-10% reduction
  • Property value before: $720,000
  • Injurious affection: $720,000 × 9% = $64,800

Noise from Operations (HVAC, Traffic, Industrial Processes)

Methodology: Measure operational noise increase, compare to background, apply market evidence of noise impact on value.

Operational noise sources:

  • Highway traffic: 65-80 dBA at 30m from highway (depending on volume, speed, trucks)
  • Railway operations: 70-90 dBA during train passage (at 50m)
  • HVAC equipment: 55-75 dBA at property line
  • Industrial facilities: 60-80 dBA at property line (depending on zoning limits)

Residential noise impact on value:

  • Moderate increase (+10 dBA over background): 5-10% value reduction
  • Significant increase (+15-20 dBA): 10-20% value reduction
  • Severe increase (+25 dBA or >70 dBA continuous): 20-30% value reduction

Example:

  • Before: Residential property, background noise 45 dBA (quiet suburban)
  • After: New highway 80m away, noise level increases to 68 dBA
  • Increase: 68 - 45 = 23 dBA (severe increase)
  • Market evidence: Comparable sales show 18% reduction for similar highway proximity
  • Property value before: $550,000
  • Injurious affection: $550,000 × 18% = $99,000

Commercial/industrial:

  • Generally minimal impact unless noise interferes with business operations
  • Example: Recording studio, noise-sensitive use, new rail line increases noise

- Impact: Business no longer viable at location (requires soundproofing or relocation) - Compensation: Soundproofing cost $120,000 or relocation cost $200,000 → adopt lower ($120,000)

Safety Perception (Property Value Discounts Near Hazards)

Methodology: Market evidence of stigma/safety perception impacts on value near hazardous infrastructure.

Hazard types and typical market discounts:

  • High-voltage transmission lines (230kV+): 5-15% discount (EMF perception, visual impact)
  • Petroleum pipelines: 5-10% discount (explosion risk perception)
  • Rail corridors (freight, hazmat): 8-15% discount (derailment risk, noise)
  • Highways: 5-12% discount (noise, air quality, safety)
  • Cell towers: 3-8% discount (health perception, visual)

Example (transmission line):

  • Before: Rural residential property, $420,000
  • After: New 500kV transmission line 150m from house (within easement corridor on adjacent land)
  • Market evidence: Sales of homes near transmission lines show 10-12% discount
  • Injurious affection: $420,000 × 11% = $46,200

Burden of proof:

  • Claimant must provide market evidence (paired sales, expert appraisal)
  • Mere fear/perception insufficient without market validation
  • Courts generally accept 5-15% range if credible market evidence provided

Market Evidence (Paired Sales Analysis, Hedonic Regression)

Paired sales analysis:

  • Identify comparable properties with/without proximity to subject infrastructure
  • Adjust for differences in size, age, condition, location
  • Extract percentage discount attributable to infrastructure proximity
  • Apply to subject property

Example dataset (residential near highways):

SaleDistance to HighwaySale PriceAdjusted PriceDiscount
1>500m (no impact)$620,000$620,0000% (baseline)
2150m$565,000$580,0006.5%
380m$540,000$555,00010.5%
450m$515,000$530,00014.5%

Regression equation: Discount = 0.002 × (500 - Distance)

  • At 100m: Discount = 0.002 × 400 = 8%
  • At 200m: Discount = 0.002 × 300 = 6%

Hedonic regression (multiple variables):

  • Model: Price = β₀ + β₁(Size) + β₂(Age) + β₃(Distance to Highway) + β₄(Noise Level) + ε
  • Isolates infrastructure impact controlling for other variables
  • More robust than paired sales (larger sample, statistical significance testing)

Example output:

  • β₃ (Distance to Highway) = +$1,200 per meter (price increases $1,200 for each meter farther from highway)
  • At 100m distance vs. 500m: Price difference = $1,200 × 400m = $480,000
  • Base price $600,000 → Discount at 100m = 8%

Business Losses During Construction

Revenue losses and cost increases during construction period, requiring careful documentation and causation analysis.

Revenue Loss Documentation (Comparative Sales Analysis)

Methodology: Compare actual revenue during construction to baseline revenue (prior years, comparable periods, industry benchmarks).

Baseline establishment:

  • Historical comparison: Same period prior years (adjusted for growth trends)
  • Control location: Comparable business unaffected by construction
  • Industry benchmarks: Verify revenue expectations are reasonable

Example (restaurant):

  • Baseline: Average monthly sales $95,000 (3-year average for construction months, adjusted +3% annual growth)
  • Construction period: 6 months
  • Actual sales during construction:

- Month 1: $88,000 (7% drop) - Month 2: $75,000 (21% drop) - Month 3: $68,000 (28% drop) - Month 4: $72,000 (24% drop) - Month 5: $80,000 (16% drop) - Month 6: $87,000 (8% drop)

  • Total revenue loss: [($95K × 6) - ($88K + $75K + $68K + $72K + $80K + $87K)] = $570K - $470K = $100,000

Causation analysis (critical):

  • Correlation with construction activity (worst months = peak construction)
  • Control for other factors (weather, competition, economic conditions)
  • Comparable business performance (if control location sales stable, strengthens claim)

Customer Access Impairment (Parking Loss, Signage Obstruction)

Parking loss quantification:

  • Retail: Typically $50-$150 sales per parking space per day
  • Restaurant: $100-$300 sales per space per day (higher turnover)
  • Office: Minimal loss (employees use transit or park farther)

Example (retail):

  • Before: 30 parking spaces, average 3 turns/day, $80 sales/turn = $7,200/day
  • During construction: 15 spaces lost for 4 months
  • Revenue loss: 15 spaces × 3 turns × $80 × 120 days = $432,000
  • Less avoided variable costs (40%): $432K × 60% = $259,200 net loss

Signage obstruction:

  • Construction hoarding, equipment blocks business signage from street
  • Quantified as percentage revenue reduction from lost visibility
  • Example: Restaurant, signage blocked for 5 months

- Estimated 15% of customers are drive-by traffic attracted by signage - Monthly sales: $100,000 × 15% = $15,000/month - Loss: $15,000 × 5 months × 60% (net of variable costs) = $45,000

Operating Cost Increases (Deliveries, Employee Commute)

Delivery complications:

  • Increased distance, time for delivery vehicles
  • Example: Loading dock blocked, requires 200m detour for all deliveries

- 10 deliveries/day × 200m × 2 (round trip) × $0.80/km × 0.1 km = $3.20/day - 180-day construction period: $3.20 × 180 = $576 (minimal)

Employee commute costs (if employer compensates):

  • Parking lot closed, employees must park 500m away
  • Employer provides shuttle or parking reimbursement
  • Example: 25 employees × $10/day parking × 120 days = $30,000

Increased security (theft/vandalism risk):

  • Example: Retail store, construction creates access vulnerabilities

- Hires security guard for 4 months: 8 hours/day × $25/hr × 120 days = $24,000

Mitigation Costs (Temporary Relocation, Marketing Campaigns)

Temporary relocation:

  • Business relocates during construction to avoid severe impacts
  • Costs: Moving (×2), temporary rent premium, dual occupancy period, customer notification
  • Example: Dental office, building uninhabitable during renovation for 6 months

- Moving costs: $15,000 × 2 = $30,000 - Temporary space premium: ($8,000 - $5,000) × 6 months = $18,000 - Dual occupancy (overlap): $8,000 × 1 month = $8,000 - Patient notification (mail, signage): $3,000 - Total relocation cost: $59,000

Marketing campaigns (to offset customer loss):

  • Additional advertising to inform customers of construction impacts, maintain loyalty
  • Example: Restaurant launches social media campaign, special promotions during construction

- Advertising: $12,000 - Promotion costs (discounts): $8,000 - Total: $20,000 - Net benefit: Revenue loss reduced from $100K to $70K → campaign saved $30K, net cost effectively $0 (or claim $70K loss + $20K mitigation costs = $90K)


This skill activates when you:

  • Assess temporary construction impacts (noise, dust, vibration, traffic disruption)
  • Quantify permanent proximity impacts (visual, noise, safety perception)
  • Document business losses during construction with revenue analysis
  • Measure noise levels (dBA), particulate matter (PM2.5/PM10), or vibration (PPV)
  • Apply paired sales analysis or hedonic regression for injurious affection valuation
  • Evaluate causation between construction/infrastructure and claimed damages
  • Calculate mitigation costs or cost-to-cure for injurious affection

适合场景

01

用户想查找某类 Agent Skill 时

02

需要根据任务场景推荐可安装能力包时

03

需要对比不同来源的安装命令和来源信息时

04

需要参考平台分布和安装热度时

能力概览

能力 1

按任务关键词查找相关 Skills

能力 2

展示可复制的安装命令

能力 3

保留来源站点、仓库和原始说明,方便继续核验

能力 4

补充不同宿主或平台的使用分布数据

能力 5

展示第三方安全扫描或审计结果

安装后应在对应宿主中按原始 README 的触发条件使用;具体调用方式请以来源页面和 README 为准。

平台分布

Claude Code

30.89%
按下载量换算26

windsurf

25.93%
按下载量换算22

trae

16.72%
按下载量换算14

OpenCode

14.01%
按下载量换算12

Codex

7.51%
按下载量换算6

Antigravity

3.42%
按下载量换算3

安全审计

Gen Agent Trust Hub

通过

Socket

通过

Snyk

通过

权限和风险

需要联网

该 Skill 可能需要联网访问来源站点、仓库或外部 API;具体网络访问范围需要结合源码和 README 复核。

安装前确认

本站仅展示第三方公开信息,不托管安装包,不提供自动安装或运行环境。安装前应自行审查源码、依赖和命令行为。

来源信息

继续浏览同类 Skills